Decision

Targets are wired, live proof remains

This is not a development blocker. It is the scorecard we use before saying Flow is 100% proven in production against competitors.

5

KPI targets

3

external proof lanes

387/402 (96.3%)

current TODO progress

Target cockpit

What must turn green before the 100% claim

Ultimate gate pass rate

Target: 100% in staging and production

Run release ultimate gate per ring after CI auth secrets are configured.

Owner: Platform/DevOps

Control-plane success rate

Target: >= 0.95

Archive control-plane verification output and compare against the weekly target.

Owner: Platform Ops

Ring gate p95 duration

Target: <= configured threshold

Use release-ring evidence to track p95 duration across planned runs.

Owner: Release Owner

Connector replay success

Target: >= 99%

Run webhook replay against first-class connectors and archive pass/fail counts.

Owner: Integrations

Funnel completeness

Target: >= 98%

Measure lead to booking to paid attribution completeness from live customer traffic.

Owner: Revenue Ops

External blockers

Not product-development blockers

  • Staging/production CI auth secrets are still external infra pending.
  • Connector replay proof needs real provider credentials for at least one first-class connector family.
  • Funnel completeness needs live customer traffic with attribution, booking and payment events.
  • Control-plane and ring p95 can be measured now, but final target pass requires the production CI ring.

Next action

Run weekly target review after each release

Use this cockpit as the single source for the last production proof loop. When each KPI has archived evidence, the remaining open TODO rows can be closed without turning the roadmap into wishful thinking.